SCIENCE PROJECTS
Projects being carried out within the framework of state science and technology programs at Samarkand State University named after Sharof Rashidov
Name of the fundamental project: FZ-20200929224 - Essential and discrete spectra of Schrödinger operators corresponding to the model of systems with a finite number of particles on a lattice.
Project Manager: Lakaev Saidakhmat Norzhigitovich, doctor of physical and mathematical sciences, academician.
The total cost of the project: 2 billion 152 million 160 thousand soums.
Project completion date: 2022-2027 years.
Name of the fundamental project: FZ-20200929385 - Creation of spectroscopic and ab initio analysis methods for the study of nano-sized molecular clusters of biological objects.
Project Manager: Zhumaboev Abduvakhid, doctor of physical and mathematical sciences, professor.
The total cost of the project: 2 billion 685 million 925 thousand 300 soums.
Project completion date: 2022-2027 years
Name of the fundamental project: FZ-2020092877 - Compilation and numerical analysis of mathematical models of processes of anomalous transfer of substances and filtration of liquids in inhomogeneous porous media.
Project Manager: Khuzhayorov Bakhtiyor, doctor of physical and mathematical sciences, professor.
The total cost of the project: 2 billion 27 million 23 thousand 400 soum.
Project completion date: 2022-2027 years
Name of the fundamental project: ФЗ-20200929385 - New solutions to Einstein’s equations for black holes and wormholes.
Project Manager: Ibadov Rustam Mustafaevich, doctor of physical and mathematical sciences, professor.
The total cost of the project: 899 million 990 thousand soums.
Project completion date: 2022-2026 years.
Name of the fundamental project: IL-5421101901 - Laser spectroscopy of the interaction of thermodynamic fluctuations in the vicinity of a singular critical point.
Project Manager: Sabirov Leonard Muhammedzhanovich, doctor of physical and mathematical sciences, professor.
The total cost of the project: 1 billion 579 million 570 thousand soums.
Project completion date: 2023-2027 years.
Name of the fundamental project: IL-4821091593 – Creation of plasmonic hybrid nanomaterials and modification of organic dyes for use in biomolecule detection systems by giant Raman scattering and fluorescence spectroscopy.
Project Manager: Kurtaliev Eldar Nurievich, Doctor of physical and mathematical sciences, Senior scientific researcher.
The total cost of the project: 694 million 702 thousand soums.
Project completion date: 2022-2024 years.
Applied project name: ALM-202303153-01 - Leeches of Uzbekistan (Hirudinea): species composition, bioecological features, distribution by types of reservoirs, study of importance in the economy and development of measures for their protection of rare species.
Project Manager: Izzatullaev Zuvaid, doctor of biological sciences, professor.
The total cost of the project: 1 billion 709 million 851 thousand soums
Project completion date: 2023-2026 year
Applied project name: UZB-Ind-2021-95 - Space Weather Consequences of Coronal Mass Ejections.
Project Manager: Mirtoshev Zavkiddin Davronovich, doctor of philosophy in physical and mathematical sciences (PhD).
The total cost of the project: 525 million soum.
Project completion date: 2021-2023 years.
Applied project name: Organization of a laboratory for the creation of anticancer drugs.
Project Manager: Bozorov Khurshed Abdulloevich, doctor of chemical sciences, professor.
The total cost of the project: 7 billion 837 million 577 thousand soums.
Project completion date: 2023-2025 years
Applied project name: Synthesis and study of the optical characteristics of halide perovskite quantum dots modified with organic dyes.
Project Manager: Kurtaliev Eldar Nurievich, doctor of physical and mathematical sciences, Senior scientific researcher.
The total cost of the project: 4 billion 851 million 164 thousand soums.
Project completion date: 2023-2025 years
Startup project name: S-2022 - Production of thermal glue based on local raw materials.
Project Manager: Tillyaev Abidzhon Dzhurakulovich, candidate of chemical sciences, associate professor.
The total cost of the project: 270 million soums.
Project completion date: 2022-2024 years